TE.R.R.A.

Article 7 of the 2026 Energy Decree introduced a set of urgent measures aimed at facilitating grid connection for on-shore renewable energy generation plants and energy storage systems, with the objective of addressing the issue of so-called virtual grid saturation. The new regulatory framework moves beyond the traditional first-come, first-served approach and introduces mechanisms designed to prioritize projects with a higher likelihood of actual implementation.

Pursuant to these provisions, the Italian Ministry of Environment and Energy Security (MASE) Decree no.291 of 8 September 2026 established the criteria for determining and updating the available grid capacity, introducing a dynamic and transparent framework that takes into account the objectives for the integration of new renewables by 2030, the evolution of permitting processes, connection requests, and the commissioning of new facilities.

The first step towards this new paradigm, as provided for in Article 3, paragraph 2, of the aforementioned MASE Decree, is the subdivision of the National Transmission Grid (NTG) into microzones, that are defined as portions of the NTG within market zones, at regional or sub-regional level, which effectively represent the main physical and operational technical constraints related to the intra-zonal transmission of electricity. Each Region or Autonomous Province is divided into one or more microzones, and each microzone encompasses one or more entire municipalities.

Info about the data

Power data, expressed in megawatts (MW), for operational renewable energy plants (RES) and storage systems, and active grid connection requests (distinguishing between those already authorised and all others), available at national, regional and microzone level.

Numerical data are always presented in English format (the full stop is used to separate decimals, comma to separate thousands).

Last Update: 10/31/2026